Locating and Accessing the System

The technician starts by locating the tank and any additional components, using property records or probing if needed, then uncovers access points to the tank and, on aerobic systems, the control panel.

Tank & Level Check

They'll check tank levels, look for signs of solids buildup or structural issues, and inspect baffles and the outlet for damage.

Aerobic Component Testing (If Applicable)

On aerobic systems, this includes testing the aerator, checking control panel function and alarms, and verifying the disinfection unit is stocked and working.

Drain Field or Spray Field Assessment

The technician evaluates the field for signs of saturation, odor, or uneven distribution, and checks spray heads or drain lines as applicable.

Report & Recommendations

Findings are documented into a written report, typically delivered within 24-48 hours, with clear recommendations for any needed follow-up.

Key Takeaways

  • An inspection covers the tank, drain or spray field, and — for aerobic systems — mechanical and electrical components.
  • Most inspections take 45-90 minutes depending on system type and site accessibility.
  • A written report with clear recommendations typically follows within 24-48 hours.

Frequently Asked Questions

How long does a typical inspection take?

Most inspections take 45-90 minutes, depending on system type and how accessible the components are.

Do I need to be present for the inspection?

It's not required, but being present lets you ask questions on the spot.

Will the technician dig up my yard?

Only enough to access existing tank and component lids — not the whole system, unless a deeper issue requires it.